The project, the contract for which was signed in 2008, consists of turn-key construction of the new Testing Laboratory for 500 MWA Hıgh-voltage Tranformers (750 ton), produced by Areva T&D.
- Engineering and detail projects
- Structurel steel construction
- Reinforced concrete construction
- Construction Management
- Safety
- Civil infrastructural works
- Mechanical and electrical designs - projects
- Mechanical, electrical and instrumentation
- Procurement
- Faraday's cage design and erection
- External and internal lighting works
- Piping works and pipe insulations
- Compressed air lines
- Epoxy coating and painting works
- Industrial Flooring
- Earthworks and excavations
- As-built drawings
- Machine and equipment demontage / montage works
- Machine and equipment foundations static analysis, designs and constructions
- Plate shearing, welded plate and pipe bolt assemblies
- Concrete embeds, leveling plates, base plates, beam bearing plates and joist bearing plates