DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
  • DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
  • DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
  • DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
  • DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
  • DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
  • DISTRIBUTION SUBSTATION AND SWITCHYARD CONSTRUCTION
Location :
TURKEY, DUZCE
Client :
UZEL - DEUTZ MOTOR CO.
Completion :
2001
Scope
The project, the contract for which was signed in 2000, consists of construction of the Distribution Substation and Switchyard of the Uzel – Deutz Motor and Tractors Plant (100.000 m²)
  • Engineering and detail projects
  • Structurel steel construction
  • Reinforced concrete construction
  • Construction Management
  • Safety
  • Civil infrastructural works
  • Procurement
  • Piping works and pipe insulations
  • Epoxy coating and painting works
  • Industrial Flooring
  • Earthworks and excavations
  • As-built drawings
  • Machine and equipment foundations static analysis, designs and constructions
  • Plate shearing, welded plate and pipe bolt assemblies
  • Concrete embeds, leveling plates, base plates, beam bearing plates and joist bearing plates
Copyright © 2010 Yonar Corporation